1209 124th Ave NE
Bellevue, WA 98005
(206) 596-2020
This development represents another step in the co-op’s vision to create a hub that is accessible, sustainable, and connected to the community. The review process typically takes 9-12 months and, once approved, REI can begin construction. REI still plans to relocate its Kent campus to Bellevue in 2020.
At this early stage in the design process, REI has made several sustainable design decisions, including:
REI’s vision is to create a campus that brings co-op employees and the local community together. The public can easily move across the campus on a series of three public pedestrian paths, linking nearby transit and residential areas. The space may also include public amenities such as a retail location, coffee shops and food options.
Photo Credit: Rendering by NBBJ